Monthly Archives: May 2018

Ryco Rail’s Steel Canopy and Loading Docks Completed by DCBG

By |2018-05-18T14:33:40-08:00May 18th, 2018|News, Openings, Renovations|

Ryco Rail has a new steel canopy and docking area. DCBG performed the demolition and grading of the existing concrete and asphalt. And, DCBG completed the concrete, structural steel, retaining wall, fencing, painted railings, gates, loading docks and bin areas. The team in North Las Vegas will have improved rack and sorting methods

Welcome To Las Vegas Store Now Open at Forum Shops in Caesar’s Palace

By |2018-05-17T15:41:28-08:00May 11th, 2018|News, Openings, Renovations|

The Welcome To Las Vegas Store is now open in Caesar's Forum Shops. DC Building Group recently renovated the 10,523 SF retail space. Improvements included demolition, framing, doors, glazing, finishes, flooring, HVAC, electrical, track lights, specialty lighting and signage/shelf/display installation. Located at 3500 S. Las Vegas Boulevard on The Strip inside Caesar's Palace Casino,

Three Wings Renovated at Mission Pines Nursing & Rehabilitation Center

By |2018-05-08T14:06:17-08:00May 8th, 2018|Construction, News, Renovations|

Mission Pines Nursing and Rehabilitation Center recently remodeled three wings of the facility. DC Building Group is proud to perform the improvements on the 100, 200 and 300 halls in multiple phases. Nursing stations, therapy rooms, main dining area, storage rooms, recreational lounges, hallways and resident rooms received upgrades and new finishes. Located